Global Global Algérie Français Algeria English Angola Português Angola English Argentina Español Argentina English Australia English Austria Deutsch Austria English Azerbaijan English Azerbaijan Русский Bahrain English Bangladesh English Belgium English Belgium Français Belgium Nederlands Brazil Português Brazil English Bulgaria български Bulgaria English Cameroon English Cameroon Français Canada English Canada Français Chile Español Chile English China 中文 China 日本語 China English Colombia Español Colombia English Croatia English Czech Republic Čeština Czech Republic English Denmark English Djibouti English Ecuador Español Ecuador English Egypt English Estonia English Ethiopia English Finland Suomi Finland English France Français France English Georgia English Georgia Русский Germany Deutsch Germany English Ghana English Greece Ελληνικά Greece English Guatemala Español Guatemala English Hong Kong, China English Hong Kong, China 中文 Hungary Magyar Hungary English India English Indonesia English Iraq English Ireland English Italy Italiano Italy English Ivory Coast Français Ivory Coast English Japan 日本語 Japan English Jordan English Kazakhstan Русский Kazakhstan English Kenya English Kuwait English Kyrgyzstan Русский Kyrgyzstan English Latvia English Lithuania English Malaysia English Mauritius English Mauritius français (Maurice) Mexico Español Mexico English Moldova Română Moldova English Mongolia English Morocco English Morocco Français Mozambique Português Mozambique English Netherlands Nederlands Netherlands English New Zealand English Nigeria English Norway English Oman English Pakistan English Paraguay Español Paraguay English Peru Español Peru English Philippines English Poland Polski Poland English Portugal Português Portugal English Qatar English Republic of Korea 한국어 Republic of Korea English Romania Română Romania English Saudi Arabia English Serbia Српски Serbia English Singapore English Slovakia English Slovenia English South Africa English Spain English Spain Español Sri Lanka English Sweden English Switzerland Deutsch Switzerland Français Switzerland Italiano Switzerland English Tanzania English Thailand ไทย Thailand English Togo English Togo Français Tunisia English Tunisia Français Türkiye Türkçe Türkiye English Turkmenistan Русский Turkmenistan English Ukraine Українська Ukraine English United Arab Emirates English United Kingdom English Uruguay Español Uruguay English USA English Uzbekistan English Uzbekistan Русский Vietnam Tiếng Việt Vietnam English

The transformer winding load test, also known as the short-circuit test, is a critical electrical performance evaluation that measures load losses and short-circuit impedance to verify design compliance, energy efficiency, and operational reliability. Conducted in accordance with international standards such as IEC 60076-1, EN 60076-1, and GB/T 1094.1, this test provides essential data for system fault calculations, parallel operation planning, and transformer condition assessment. This article explains the technical principles, sample types, testing procedures, and practical applications of transformer winding load testing in detail.

Technical Overview

The transformer winding load test is a routine performance test performed to determine the load losses (copper losses) and the impedance voltage of a transformer under simulated full-load current conditions. Because performing the test at actual rated voltage would require enormous power, the test is instead carried out by short-circuiting one winding and applying a reduced voltage at rated frequency to the other winding. The applied voltage is gradually increased until rated current (or a specified fraction of rated current) flows through the windings.

Under this condition, the excitation current is negligible because the applied voltage is very low (typically only 4% to 20% of rated voltage). As a result, the measured input power essentially represents the total load losses, while the applied voltage required to circulate rated current represents the impedance voltage of the transformer. The load losses measured in this test consist of three main components:

  • DC resistance (I²R) losses: ohmic losses in the winding conductors, which vary with winding resistance and current.
  • Eddy current losses: circulating current losses within the winding conductors caused by leakage magnetic flux.
  • Stray losses: additional losses induced by leakage flux in the tank walls, core clamps, bushings, and structural components.

The test is typically governed by IEC 60076-1, EN 60076-1, GB/T 1094.1, and IEEE C57.12.90, which define the measurement circuits, reference temperatures, correction formulas, and tolerance limits. For oil-immersed transformers, load losses are corrected to a reference temperature of 75°C, while for dry-type transformers the reference temperature depends on the insulation class (for example, 120°C for Class F insulation).

Testing Samples

Oil-Immersed Power Transformers

Large power transformers used in generation plants, transmission substations, and industrial power systems are primary candidates for winding load tests. These units typically have ratings from several MVA to hundreds of MVA, and the load test verifies that the impedance matches the value used in system fault-level studies and relay coordination settings.

Dry-Type Transformers

Cast-resin and vacuum-pressure-impregnated (VPI) dry-type transformers used in commercial buildings, data centers, underground installations, and marine applications undergo load testing with specific attention to temperature correction, since their reference temperatures are higher than those of oil-immersed units.

Distribution Transformers

Pole-mounted, pad-mounted, and compact substation distribution transformers are tested in high-volume production environments. Load loss measurement is particularly important for these units because energy efficiency regulations in many markets impose strict limits on total losses.

Special Transformers and Reactors

Autotransformers, rectifier transformers, furnace transformers, and shunt or series reactors also require load-type testing, with adapted procedures to account for non-standard winding configurations and duty cycles.

Testing Items

A complete transformer winding load test program typically includes the following measured and derived parameters:

  • Load loss (kW): the total active power absorbed by the transformer at rated current, corrected to the reference temperature.
  • Impedance voltage (V or %): the voltage required to circulate rated current with the secondary winding short-circuited, expressed as a percentage of rated voltage.
  • Short-circuit impedance (Z or %): the reactive and resistive impedance derived from the impedance voltage, essential for fault current calculations.
  • Load loss component separation: separation of I²R losses from stray and eddy losses using winding resistance measurements for accurate temperature correction.
  • Total losses verification: combination of corrected load losses and no-load losses for comparison against guaranteed values and efficiency class limits.
  • Tolerance assessment: evaluation against standard limits, typically ±10% on impedance and +15% on load losses, or stricter contractual values, per IEC 60076-1.

Testing Methods

Test Circuit and Setup

The standard test circuit applies a single-phase or three-phase reduced voltage source to one winding (usually the lower-voltage winding is short-circuited and voltage is applied to the higher-voltage winding, although the reverse arrangement is also acceptable if measurement accuracy permits). Precision instrument transformers, power analyzers, and RMS-accurate voltmeters and ammeters are connected to measure input power, voltage, current, and frequency simultaneously. All three phases of the short-circuited winding must be solidly connected with low-resistance busbars or cables of sufficient cross-section, since the resistance of the shorting connections directly adds to the measured losses.

Step-by-Step Procedure

  • Record the winding temperature (or ambient temperature after thermal stabilization) and measure the DC resistance of each winding prior to the test.
  • Firmly short-circuit the terminals of one winding using low-resistance connections sized for rated current.
  • Apply a low voltage at rated frequency to the opposite winding and gradually increase it until the current reaches the specified test value, usually 100% of rated current or the highest practicable value for large units.
  • Simultaneously record input power, applied voltage, current, and frequency once readings stabilize.
  • Repeat the measurement between other winding pairs for multi-winding transformers.
  • Correct the measured losses and impedance to the reference temperature using the applicable correction formulas.
  • Subtract the I²R losses of the short-circuiting connections and any measurement circuit losses from the total measured power.

Temperature Correction

Because DC resistance losses increase with temperature while stray and eddy losses decrease with temperature, the measured load loss must be corrected to the reference temperature. The I²R component is scaled by the ratio of conductor resistance at the reference temperature to that at the test temperature, using the material constant of 235 for copper and 225 for aluminum, while the remaining stray loss component is scaled by the inverse ratio. Accurate winding temperature determination at the moment of measurement is therefore essential for valid results.

Partial-Current Testing for Large Units

For very large transformers where the full rated current cannot be supplied by the test bay, measurements are taken at reduced current (for example, 50% to 70% of rated). The I²R and eddy loss components are then extrapolated by the square of the current ratio, and the results are corrected to rated conditions and reference temperature in accordance with the relevant standard.

Applications

  • Factory routine testing: verification of guaranteed load losses and impedance on every manufactured unit before shipment.
  • Type and acceptance testing: demonstration of design compliance during qualification or witnessed testing for utilities and industrial purchasers.
  • Energy efficiency compliance: confirmation that total losses meet regulatory efficiency tiers and eco-design requirements in various markets.
  • System engineering studies: provision of accurate impedance data for short-circuit calculations, voltage regulation analysis, protective relay setting, and load flow studies.
  • Parallel operation planning: confirmation that transformers intended to operate in parallel have compatible impedances and vector relationships to ensure proper load sharing.
  • Condition assessment and diagnostics: comparison of measured impedance and losses against factory values to detect winding deformation, displacement, inter-turn short circuits, or damaged conductor strands after through-faults, transport, or years of service.

FAQ

What is the difference between a no-load test and a load test?

The no-load test is performed by applying rated voltage to one winding with the other winding open-circuited, and it measures core losses (iron losses) and magnetizing current. The load test is performed by short-circuiting one winding and applying a reduced voltage to circulate rated current, and it measures load losses (copper-related losses) and impedance voltage. Together, the two tests establish the total losses of the transformer.

Why are load losses corrected to a reference temperature?

Load losses vary with winding temperature: resistance losses rise with temperature while stray losses fall slightly. To allow fair comparison between measured results and guaranteed design values, and between different transformers, standards require all losses to be corrected to a defined reference temperature, which is 75°C for oil-immersed transformers and an insulation-class-dependent value for dry-type transformers.

What does an abnormal impedance result indicate?

A measured impedance that deviates significantly from the original factory value may indicate winding deformation, axial displacement, loose clamping structures, or internal shorted turns caused by mechanical or thermal stress. Such findings typically trigger additional diagnostic testing, such as frequency response analysis, before the transformer is returned to service.

How accurate must the load test measurements be?

Standards require measurement uncertainties low enough to verify loss tolerances with confidence, typically achieved with class 0.1 or better instrument transformers and precision power analyzers with wide power-factor capability, since the power factor during a load test is very low (often below 0.05). Cable and busbar losses in the shorting connections must also be measured or calculated and subtracted from the total.

Can the load test detect all winding defects?

The load test is highly sensitive to changes in impedance and resistance, making it effective for detecting gross deformation and conductor damage. However, subtle inter-turn insulation faults may require complementary methods, including no-load current analysis, dissolved gas analysis for oil-filled units, and frequency response measurements, as part of a comprehensive diagnostic program.